Company
History
-
1963
-
Jul.
Established Tobu Heavy Industries Co., Ltd.
-
Nov.
2.5t Telfer 4 type with grab bucket for raw sugar for Meiji Sugar
(the first of our products)
-
-
1965
-
Nov.
Established Tobu Heavy Industries Co., Ltd.
Moved the head office and factory to Ukita, Edogawa-ku, Tokyo
-
-
1966
-
Apr.
Tsuji Sangyo Full-scale entry into the marine field for deck cranes
-
-
1967
-
Apr.
Delivered a dedicated ship for wood chips, orange peel type grab bucket
(Mitsui OSK Lines “Daiomaru” 13m³) -
May.
First export to Taiwan Kaohsiung Port Affairs Bureau
10 single index string type grab buckets for ore
-
-
1970
-
Jul.
Design, manufacture and delivery of an improved version of a large grab bucket for steelworks raw material quays
Volume 30.7m³ (for coal) 9.8 m³ (broken ore) 9.6 m³ (powdered ore)
-
-
1973
-
Mar.
Opened Funabashi Factory in the suburbs of Funabashi City
-
Aug.
Delivered the world’s largest electro-hydraulic grab bucket Volume for earth and sand 20m³ Own weight 36t (Corresponding to this four bridge construction)
-
-
1976
-
Feb.
Special lightweight double rope grab bucket for Kuwait 2.8m³ 6 units
(Nitomo Maru-for Yamashita Shin Nihon Kisen)
Pioneering delivery to the Middle East
-
-
1977
-
May.
Moved the head office factory to the current location, Urayasu City
-
-
1979
-
Feb.
Delivered a large marine single-cable grab bucket and remote control pull string release device
(Yamashita Shin Nihon Kisen Cement Clinker for Kuwait 6.5m³ x 8.5t 5 types)
-
-
1983
-
Feb.
Developed Japan’s first full-scale radio-controlled single-cable grab bucket
(Claw type 4m³ x 4t)
-
-
1992
-
Nov.
Developed a new large cylinder type wireless single cable grab bucket,
coal 10m³ 4 units (For Nippon Paper Industries / Yatsushiro Port Transport)
-
-
1996
-
May.
Developed a three-claw crossed engine-driven hydraulic grab bucket for handling rice materials
20m³, own weight 6t (for Ura Wharf in Tako, Shizuoka Prefecture)
-
-
1999
-
Apr.
The head office building and Urayasu factory will be completely rebuilt to support multipurpose functions.
-
-
2002
-
Feb.
Received “Invention Grand Prize / Invention Achievement Award” for single-line wireless grab bucket
(Japan Institute for the Promotion of Invention) -
Oct.
Developed a shockless valve (buffer device) compatible with single-cylinder wireless cylinder type grab buckets.
Super-large 20-30 m³ class (wood chips 20 m³ for Nippon Paper Industries) -
Oct.
Received “Small and Medium Business Administration Commissioner Encouragement Award” and “Implementation Achievement Award” with coil lifter (Invention Association)
-
-
2003
-
Feb.
The head office building was expanded to expand the R & D space and strengthen support for the next generation.
-
Oct.
Succeeded in increasing the size of the scrap (for scrap iron) engine hydraulic orange peel type grab bucket.
Delivered the world’s largest 6m³ (for Toyo Wharf)
-
-
2004
-
Apr.
A ceremony to commemorate the 40th anniversary of the founding was held by inviting about 200 people from Japan and overseas.
Demonstration of single-cable wireless grab bucket and coil lifter in the factory. -
Apr.
Develop and deliver a single-cylinder wireless cylinder type orange peel type grab bucket(For Hitachi Wharf)
-
-
2005
-
Oct.
An 18-ton suspended fixed crane was added to the head office building.
-
Nov.
Completed the newly developed single-cylinder wireless cylinder type [X7].
Held a show to partner companies.
-
-
2006
-
May.
Develop and deliver electro-hydraulic telescopic suspension with a maximum suspension load of 15 tons (For Tagonoura Wharf)
-
Jul.
Developed a lightweight single-cylinder wireless cylinder grab bucket [C8] for marine use.
-
-
2007
-
Mar.
The first machine with an engine-type grab bucket swivel mechanism for rice materials started operation.
-
Dec.
Delivered Maruti Suzuki’s Indian 20t horizontal coil lifter.
-
-
2008
-
Mar.
Opened Sasebo Factory.
-
Dec.
Concluded an after-sales service contract with IHI Marine Engineering (S) Pte Ltd.
Concluded an after-sales service contract with IHI Marine (Shanghai) Co., Ltd.
-
-
2009
-
Jul.
Concluded an after-sales service contract with IHI Marine B.V. (Rotterdam).
-
Jul.
Opened Urayasu factory.
-
-
2011
-
Mar.
Urayasu factory (Chidori district) expansion work completed
-
-
2012
-
Apr.
Completion of expansion work for Sasebo factory
-